TM-Econ Mitigation Bank
E Sciences’ staff of engineers and hydrologists provided hydrological consulting services to recreate the historic flow regimes throughout the project site in order to enhance the biological and wildlife communities.
During the course of the historical uses of the site, clear-cutting of forests, construction of roads and bridges, and, the installation of drainage ditches and culverts significantly altered the site hydrology along with reduced flood storage capacity and degradation of water quality.
E Sciences performed a complete hydrologic analysis of the site and designed improvements required for submittal of a conceptual wetland mitigation bank permit document as well as a construction-level permit for the initial phase of the project.